Wind farms
Templederry (Ireland)| Templederry (Ireland) |
|
| Operational (4,6 MW) |

| Country | Ireland |
| County/Zone | Tipperary (Munster) |
| Wind farm type | Onshore wind farm |

![]() | 4.6 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E70/2300 (x 2) |

![]() | |
![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 52° 46' 44" - Longitude -8° 8' 51.2" |
| Precise localization | Yes |
Databases ![]() Ireland (11.3 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Curraghgraigue (3 km) Ballinlough-Ikerrin (11 km) Cappawhite B (11 km) Garracummer (14 km) Ballinveny (14 km) Knockastanna (14 km) Mienvee (14 km) Mienvee 2 (14 km) Hollyford (15 km) Glenough (16 km) | ||
|
Insights Production capacity Ireland : 5,119.0 MW (end of 2025) Tipperary (Munster) : 442.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 30 July 2021 |
||