[Back to previous page]
Generalities
|
|
Details
Part #1:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Operator: China State Power Corp
Part #2:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 150,000 kW
- Operational
- Onshore wind farm
- Owner:

Part #3:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Owner:

Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.6 %
- Expected production: 7,410 kWh
- Values from Weathernews Windcaster solution
Part #4:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.6 %
- Expected production: 79,400 kWh
- Values from Weathernews Windcaster solution
Part #5:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Huaneng Group
- Owner:

Part #6:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Owner:

Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.7 %
- Expected production: 88,030 kWh
- Values from Weathernews Windcaster solution
Part #7:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.9 %
- Expected production: 23,360 kWh
- Values from Weathernews Windcaster solution
Part #8:
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.9 %
- Expected production: 22,320 kWh
- Values from Weathernews Windcaster solution
Part #9:
- Commissioning:

- 14 turbines: Goldwind S50/750 (power 750 kW, diameter 50 m)
- Total nominal power: 10,500 kW
- Operational
- Onshore wind farm
Part #10:
- Commissioning:

- 52 turbines: Goldwind S50/750 (power 750 kW, diameter 50 m)
- Total nominal power: 39,000 kW
- Operational
- Onshore wind farm
Part #11:
- Commissioning:

- 33 turbines: Goldwind GW82/1500 (power 1 500 kW, diameter 82.3 m)
- Total nominal power: 49,500 kW
- Operational
- Onshore wind farm
- Owner:

Localisation
Part #1:
- Latitude: 47° 50' 49.9"
- Longitude: 86° 42' 51.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 42° 28' 49.7"
- Longitude: 85° 27' 47.8"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 47° 51' 34.9"
- Longitude: 86° 39' 21.9"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 47° 31' 8.3"
- Longitude: 86° 16' 44"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 47° 42' 17.6"
- Longitude: 86° 51' 3.2"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 42° 28' 49.7"
- Longitude: 85° 27' 47.8"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 47° 37' 25.6"
- Longitude: 86° 52' 28.9"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 48° 27' 27"
- Longitude: 86° 58' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 47° 50' 49.9"
- Longitude: 86° 42' 51.4"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 47° 50' 49.9"
- Longitude: 86° 42' 51.4"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 47° 50' 49.9"
- Longitude: 86° 42' 51.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 September 2022
Complete/correct this sheet: