[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Halenbeck-Rohlsdorf
- Commissioning:

- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Developer: Windstrom
Part #2:
- Part: Prignitz
- City: Halenbeck-Rohlsdorf
- Commissioning:

- 2 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developers: Windstrom/Wind7
- Operators: Windstrom/Wind7
- Source:

- Source:

Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.4 %
- Expected production: 3,530 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Prignitz
- City: Halenbeck-Rohlsdorf
- Commissioning:

- 12 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Hub height:

- Total nominal power: 12,000 kW
- Dismantled (2020/01)
- Onshore wind farm
- Developers: Windstrom/Wind7
- Source:

- Source:

Localisation
Part #1:
- Latitude: 53° 15' 29.3"
- Longitude: 12° 17' 18.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Prignitz
- Latitude: 53° 15' 41.2"
- Longitude: 12° 17' 52.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Prignitz
- Latitude: 53° 15' 41.2"
- Longitude: 12° 17' 52.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 2 June 2022
Complete/correct this sheet: