Part #1:
- City: Schortewitz
- Commissioning:

- 3 turbines: Nordex N80/2500 (power 2 500 kW, diameter 80 m)
- Hub height:

- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developer: Nordex
- Operator: E.ON Climate Renewables
- Owners:
/ND - Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 27.4 %
- Expected production: 49,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Schortewitz
- Commissioning:

- 4 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
- Operator: Statkraft
- Owner:

- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 50.8 %
- Expected production: 73,160 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 39' 35.5"
- Longitude: 12° 2' 48.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 39' 35.5"
- Longitude: 12° 2' 48.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0