- Commissioning:

- 5 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: Holrom srl
- Operator: Holrom srl
- Source:

Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 45° 26' 13.1"
- Longitude: 28° 2' 16"
- Geodetic system: WGS84