Wind farms
Lugau (Germany)| Lugau (Germany) |
|
| Operational (6,5 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Doberlug-Kirchhain |
| Wind farm type | Onshore wind farm |

![]() | 1.8 MW commissioned |
![]() | 2.7 MW commissioned |
![]() | 2 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Dewind D4 (x 3) |
| Operational | Neg Micon NM52/900 (x 3) |
| Operational | Vestas V90/2000 (x 1) |

![]() | |
![]() | |
![]() | |

| City | Doberlug-Kirchhain |
| Commissioning | ![]() |
| Turbines | 3x Dewind D4 (power 600 kW, diameter 48 m) |
| Hub height | ![]() |
| Total nominal power | 1,800 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 51° 37' 9" - Longitude 13° 35' 57.9" |
| Precise localization | Yes |
| City | Doberlug-Kirchhain |
| Commissioning | ![]() |
| Turbine | 1x Vestas V90/2000 (power 2,000 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 51° 37' 9" - Longitude 13° 35' 57.9" |
| Precise localization | Yes |
| Part | Finsterwalde |
| City | Doberlug-Kirchhain |
| Commissioning | ![]() |
| Turbines | 3x Neg Micon NM52/900 (power 900 kW, diameter 52.2 m) |
| Hub height | ![]() |
| Total nominal power | 2,700 kW |
| Status | Operational |
| Coordinates | Latitude 51° 37' 5.9" - Longitude 13° 36' 10.2" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lindena (6 km) Großenwede (Brandenburg) (8 km) Massen beim Lausitzring (9 km) Schacksdorf (10 km) Doberlug-Kirchhain (10 km) Dübrichen (11 km) Betten (12 km) Betten Nord (12 km) Hillmersdorf (12 km) Dübrichen-Prießen (12 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Brandenburg : 10,012.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 18 November 2022 |
||