Generalities
|
|
Details
Part #1:
Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.6 %
- Expected production: 6,340 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Selmsdorf
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: Renerco
- Operator: BayWa R.E.
- Owner:

- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 3.6 %
- Expected production: 1,970 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 52' 31"
- Longitude: 10° 53' 33.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 52' 31"
- Longitude: 10° 53' 33.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 June 2022
Complete/correct this sheet: