The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Neukyhna-Zaasch (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

  • Wind farm name: Neukyhna-Zaasch
  • Country: Germany
  • County / Zone: Sachsen
PDF

Details


Part #1:

  • City: Zaasch
  • Commissioning: 1998
  • 1 turbine: Vestas V47/660 (power 660 kW, diameter 47 m)
  • Hub height: 65 m
  • Total nominal power: 660 kW
  • Operational
  • Onshore wind farm
  • Developer: Zopf GmbH
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.9 %
  • Expected production: 9,170 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Zaasch
  • Commissioning: 1999
  • 2 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
  • Hub height: 65 m
  • Total nominal power: 1,320 kW
  • Operational
  • Onshore wind farm
  • Developer: Zopf GmbH
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.9 %
  • Expected production: 18,350 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Zaasch
  • Commissioning: 2000
  • 9 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
  • Hub height: 74 m
  • Total nominal power: 5,940 kW
  • Operational
  • Onshore wind farm
  • Developer: Zopf GmbH
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.9 %
  • Expected production: 82,570 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Zaasch
  • Commissioning: 2011
  • 2 turbines: Enercon E53/800 (power 800 kW, diameter 52.9 m)
  • Hub height: 73 m
  • Total nominal power: 1,600 kW
  • Operational
  • Onshore wind farm
  • Developer: Zopf GmbH
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 48.7 %
  • Expected production: 18,700 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 51° 33' 10.7"
  • Longitude: 12° 17' 27.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 51° 33' 10.7"
  • Longitude: 12° 17' 27.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 51° 33' 10.7"
  • Longitude: 12° 17' 27.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Latitude: 51° 33' 33.5"
  • Longitude: 12° 17' 26.1"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 26 September 2018
Complete/correct this sheet: