[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Simmersfeld, Seewald
- Commissioning:

- 10 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Developer: Altus
- Operator: Altus
- Owner:

- Source:

Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 79.7 %
- Expected production: 382,560 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Simmersfeld, Seewald
- Commissioning:

- 4 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: Altus
- Operator: Altus
- Owner:

- Source:

Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 11.5 %
- Expected production: 22,080 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 48° 37' 2"
- Longitude: 8° 27' 42.4"
- Altitude: 800 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 48° 37' 2"
- Longitude: 8° 27' 42.4"
- Altitude: 800 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 October 2022
Complete/correct this sheet: