[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Angermünde
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 270 kW
- Dismantled
- Onshore wind farm
Part #2:
- City: Angermünde
- Commissioning:

- 8 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:

- Total nominal power: 10,400 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Owners:
/ND - Source:

Production forecast
- From Wednesday, March 03 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 8.2 %
- Expected production: 20,550 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Frauenhagen
- Commissioning:

- 1 turbine: Vensys 77 (power 1 500 kW, diameter 76.8 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Source:

Production forecast
- From Wednesday, March 03 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 3.2 %
- Expected production: 1,150 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 4' 46.8"
- Longitude: 14° 3' 14.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 4' 46.3"
- Longitude: 14° 4' 6.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 22' 49.9"
- Longitude: 14° 8' 51.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 24 January 2019
Complete/correct this sheet: