Generalities
|
|
Details
Part #1:
- City: Brugge Boudewijnkanaal
- Commissioning:

- 4 turbines: Turbowinds T400-34 (power 400 kW, diameter 34 m)
- Hub height:

- Total nominal power: 1,600 kW
- Operational
- Onshore wind farm
- Developer: Electrawinds
Production forecast
- From Friday, December 1 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 8.6 %
- Expected production: 3,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Windpark Herdersbrug-VCR
- City: Brugge Boudewijnkanaal
- Commissioning:

- 12 turbines: Turbowinds T600-48 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 7,200 kW
- Dismantled
- Onshore wind farm
- Developer: Electrawinds
Part #3:
- Part: Windpark Herdersbrug-VCR
- City: Brugge Boudewijnkanaal
- Commissioning:

- 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: Aspiravi
- Operator: Aspiravi
- Owner:

- Source:

Localisation
Part #1:
- Latitude: 51° 15' 47.1"
- Longitude: 3° 12' 47.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Windpark Herdersbrug-VCR
- Latitude: 51° 15' 47.1"
- Longitude: 3° 12' 47.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Windpark Herdersbrug-VCR
- Latitude: 51° 15' 47.1"
- Longitude: 3° 12' 47.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: