The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Deutschkreutz (Austria)


[Back to previous page]

Austria wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • Part: Deutschkreutz I
  • City: Deutschkreutz
  • Commissioning: 2005/05
  • 7 turbines: Repower MM82 (power 2 000 kW, diameter 82 m)
  • Hub height: 100 m
  • Total nominal power: 14,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Energie Burgenland
  • Operator: Energie Burgenland
  • Owner: Energie Burgenland
  • Source: http://www.energieburgenland.at/oekoenergie/windkraft/windparks/standorte.html
  • Source: https://www.igwindkraft.at

       Production forecast

  • From Tuesday, May 26 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 77 %
  • Expected production: 258,640 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • Part: Deutschkreutz II
  • City: Deutschkreutz
  • Commissioning: 2011
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 138 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developer: Energie Burgenland
  • Operator: Energie Burgenland
  • Owner: Energie Burgenland
  • Source: http://www.energieburgenland.at/oekoenergie/windkraft/windparks/standorte.html
  • Source: https://www.igwindkraft.at

       Production forecast

  • From Tuesday, May 26 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 65.1 %
  • Expected production: 35,920 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • Part: Deutschkreutz II Erweiterung
  • City: Deutschkreutz
  • Commissioning: 2016
  • 1 turbine: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Hub height: 138 m
  • Total nominal power: 2,350 kW
  • Operational
  • Onshore wind farm
  • Developer: Energie Burgenland
  • Operator: Energie Burgenland
  • Owner: Energie Burgenland
  • Source: http://www.energieburgenland.at/oekoenergie/windkraft/windparks/standorte.html
  • Source: https://www.igwindkraft.at

       Production forecast

  • From Tuesday, May 26 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 12.9 %
  • Expected production: 7,270 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Part: Deutschkreutz I
  • Latitude: 47° 34' 47"
  • Longitude: 16° 37' 12.7"
  • Altitude: 192 m
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Deutschkreutz II
  • Latitude: 47° 34' 29.2"
  • Longitude: 16° 36' 48.7"
  • Altitude: 192 m
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Part: Deutschkreutz II Erweiterung
  • Latitude: 47° 34' 35.1"
  • Longitude: 16° 37' 16.6"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 29 April 2019
Complete/correct this sheet:



The Wind Power
contact@thewindpower.net
All rights reserved - 2005-2020

General Terms and Conditions of Sale - Partners
NEWSLETTER