General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Würselen
  • Commissioning: 2005
  • 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 100 m
  • Total nominal power: 4,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Energiekontor
  • Operator: Energiekontor
  • Owner: Energiekontor
  • Source: http://www.energiekontor.de/en/references/wind-farms.html

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 5.4 %
  • Expected production: 5,780 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Würselen
  • Commissioning: 2009/09
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 98 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 17.5 %
  • Expected production: 9,660 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Part: Würselen I-II
  • City: Würselen
  • Commissioning: 2003/11
  • 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 98 m
  • Total nominal power: 3,600 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren
  • Source: https://www.rea-dn.de/Projekte/Windenergie/windpark-wuerselen-broichweiden/

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 5.1 %
  • Expected production: 4,370 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Part: Würselen III
  • City: Würselen
  • Commissioning: 2009/09
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 98 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren
  • Source: https://www.rea-dn.de/Projekte/Windenergie/windpark-wuerselen-birk/

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 8.4 %
  • Expected production: 4,610 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 50° 50' 12.7"
  • Longitude: 6° 8' 50.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 50° 50' 46.5"
  • Longitude: 6° 7' 57.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Part: Würselen I-II
  • Latitude: 50° 50' 36"
  • Longitude: 6° 12' 1.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Part: Würselen III
  • Latitude: 50° 50' 46.5"
  • Longitude: 6° 7' 57.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 9 October 2018