[Back to previous page]
Generalities
- Wind farm name: Foggia
- Country: Italy
- County / Zone: Puglia
|
|
Details
Part #1:
- City: Foggia
- 1 turbine: Enercon E33/330 (power 330 kW, diameter 33.4 m)
- Total nominal power: 330 kW
- Operational
- Onshore wind farm
- Operator: Fortore Energia
Production forecast
- From Tuesday, April 20 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.8 %
- Expected production: 140 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Foggia
- 1 turbine: Leitwind LTW77-1000 (power 1 000 kW, diameter 77 m)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Operator: Jackson srl
Production forecast
- From Tuesday, April 20 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.1 %
- Expected production: 750 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Tuesday, April 20 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.2 %
- Expected production: 530 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 27' 36"
- Longitude: 15° 33' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 41° 27' 36"
- Longitude: 15° 33' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 41° 27' 36"
- Longitude: 15° 33' 0"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 1 April 2016
Complete/correct this sheet: