Part #1:
- City: Krummbek
- Commissioning:

- 2 turbines: Vestas V66/1750 (power 1 750 kW, diameter 66 m)
- Hub height:

- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 29.6 %
- Expected production: 24,820 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Krummbek
- Commissioning:

- 1 turbine: Repower MM82 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 18.4 %
- Expected production: 8,820 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Krummbek
- Commissioning:

- 1 turbine: Nordex S70 (power 1 500 kW, diameter 70 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 23.8 %
- Expected production: 8,580 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 21' 28.7"
- Longitude: 10° 24' 11.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 21' 28.7"
- Longitude: 10° 24' 11.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 54° 21' 28.7"
- Longitude: 10° 24' 11.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 15 July 2022