[Back to previous page]
Generalities
|
|
Details
- City: Bernes
- Commissioning:

- 6 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92 m)
- Total nominal power: 12,300 kW
- Operational
- Onshore wind farm
- Developer: Maïa Eolis
- Operator: Engie
- Owner:

Production forecast
- From Tuesday, April 20 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.1 %
- Expected production: 3,310 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 49° 54' 42.6"
- Longitude: 3° 6' 50"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 September 2019
Complete/correct this sheet: