Wind farms
Withernwick (United-Kingdom)| Withernwick (United-Kingdom) |
|
| Operational (26,65 MW) |

| Country | United-Kingdom |
| County/Zone | East Riding of Yorkshire (England) |
| City | Hornsea |
| Wind farm type | Onshore wind farm |

![]() | 8.2 MW commissioned |
![]() | 10.25 MW commissioned |
![]() | 8.2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturers |
#ND |

| Operational | Senvion MM82/2050 (x 9) |
| Operational | #ND (x 4) |

![]() | |

| Part | Resubmission |
| City | Hornsea |
| Commissioning | ![]() |
| Turbines | 4x Senvion MM82/2050 (power 2,050 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 8,200 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 53° 51' 2.8" - Longitude -0° 9' 47.7" |
| Precise localization | Yes |
| Part | Resubmission |
| City | Hornsea |
| Commissioning | ![]() |
| Turbines | 5x Senvion MM82/2050 (power 2,050 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 10,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 53° 51' 2.8" - Longitude -0° 9' 47.7" |
| Precise localization | Yes |
Databases ![]() United-Kingdom (104.8 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms The Limes (East Riding) (11 km) Burton Pidsea (12 km) Hull Waste Water Treatment Works (13 km) Sunderland resubmission (13 km) Hall Farm (13 km) Tedder Hill (14 km) Croda Chemicals Europe Hull Site (15 km) Mount Pleasant Farm (15 km) Lissett Airfield (19 km) Far Marsh (20 km) | ||
|
Insights Production capacity United-Kingdom : 32,894.0 MW (end of 2025) East Riding of Yorkshire (England) : 296.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 23 May 2026 |
||