[Back to previous page]
Details
- City: North Frodingham
- Commissioning:

- 1 turbine: EWT Directwind 500/54 (power 500 kW, diameter 54 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Owner:

Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 34.9 %
- Expected production: 4,190 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 53° 57' 5.3"
- Longitude: -0° 19' 2.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 4 March 2020
Complete/correct this sheet: