Wind farms
Asted (Skive) (Denmark)| Asted (Skive) (Denmark) |
|
| Operational (12 MW) - Dismantled (0,6 MW) |

| Country | Denmark |
| County/Zone | Skive (Midtjylland) |
| City | Asted |
| Wind farm type | Onshore wind farm |

![]() | 0.6 MW commissioned |
![]() | 12 MW commissioned |
![]() | 0.6 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Siemens SWT-3.0-101 (x 4) |
| Dismantled | Nordex N43/600 (x 1) |

![]() | |

| City | Asted |
| Commissioning | ![]() |
| Turbine | 1x Nordex N43/600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Dismantled (2013/06) |
| Coordinates | Latitude 56° 46' 11.5" - Longitude 8° 58' 51.5" |
| Precise localization | No |
| City | Asted |
| Commissioning | ![]() |
| Turbines | 4x Siemens SWT-3.0-101 (power 3,000 kW, diameter 101 m) |
| Hub height | ![]() |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Coordinates | Latitude 56° 46' 11.5" - Longitude 8° 58' 51.5" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Nissum (Skive) (2 km) Risum (3 km) Tondering (3 km) Toustrup (3 km) Durup (3 km) Lindum Vindmollepark (3 km) Lindum (3 km) Selde (4 km) Sæby (5 km) Bysted-Nautrup (5 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Skive (Midtjylland) : 139.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 25 April 2019 |
||