Wind farms
Alto da Coutada (Portugal)| Alto da Coutada (Portugal) |
|
| Operational (165,6 MW) |

| Country | Portugal |
| County/Zone | Vila Real (Norte) |
| City | Vila Pouca de Aguiar |
| Wind farm type | Onshore wind farm |

![]() | 52.9 MW commissioned |
![]() | 16.1 MW commissioned |
![]() | 46 MW commissioned |
![]() | 50.6 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | Enercon E82/2300 (x 72) |

![]() | |

| City | Vila Pouca de Aguiar |
| Commissioning | ![]() |
| Turbines | 7x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 16,100 kW |
| Status | Operational |
| Coordinates | Latitude 41° 32' 42.8" - Longitude -7° 33' 16.3" |
| Precise localization | Yes |
| City | Vila Pouca de Aguiar |
| Commissioning | ![]() |
| Turbines | 20x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 46,000 kW |
| Status | Operational |
| Coordinates | Latitude 41° 32' 42.8" - Longitude -7° 33' 16.3" |
| Precise localization | Yes |
| City | Vila Pouca de Aguiar |
| Commissioning | ![]() |
| Turbines | 23x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 52,900 kW |
| Status | Operational |
| Coordinates | Latitude 41° 32' 42.8" - Longitude -7° 33' 16.3" |
| Precise localization | Yes |
| Part | Falperra Rechãzinha |
| City | Vila Pouca de Aguiar |
| Commissioning | ![]() |
| Turbines | 22x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 50,600 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 41° 32' 42.8" - Longitude -7° 33' 16.3" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Casa da Lagoa (3 km) Padrela (3 km) Cha do Guilhado (7 km) Salgueiros-Guilhado (7 km) Negrelo-Guilhado (10 km) Trandeiras (11 km) Bulgueira (14 km) Serra do Alvao (21 km) Leiranco (22 km) Serra do Leiranco (23 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Vila Real (Norte) : 684.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||