- City: Crivitz
- Commissioning:

- 2 turbines: Enron 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Ventotec
- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.4 %
- Expected production: 4,590 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.3 %
- Expected production: 1,600 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Kladrum
- Commissioning:

- 3 turbines: e.n.o. energy 92 (power 2 200 kW, diameter 92.8 m)
- Hub height:

- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Developers: WPD/e3 GmbH/Naturwind
- Operators: WPD/e3 GmbH
- Owners:
/
- Source:

- Source:

Part #4:
- Part: Kladrum-Friedrichsruhe
- City: Kladrum, Crivitz
- Commissioning:

- 18 turbines: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
- Developers: Ventotec/Germania Windpark
- Operator: Germania Windpark
- Source:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.7 %
- Expected production: 17,390 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 33' 33.3"
- Longitude: 11° 47' 52.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 33' 33.3"
- Longitude: 11° 47' 52.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 33' 33.3"
- Longitude: 11° 47' 52.5"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Kladrum-Friedrichsruhe
- Latitude: 53° 33' 33.3"
- Longitude: 11° 47' 52.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 24 June 2022