Part #1:

  • City: Görike
  • Commissioning: 2003
  • 5 turbines: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 7,500 kW
  • Operational
  • Onshore wind farm
  • Developers: WPD/Windenergie Wenger-Rosenau GmbH
  • Source: http://www.wenger-rosenau.de/
  • Source: http://www.wpd.de/referenzen/

       Production forecast

  • From Monday, September 25 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 14.3 %
  • Expected production: 25,680 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Görike
  • Commissioning: 2002/12
  • 6 turbines: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Developers: WPD/Windenergie Wenger-Rosenau GmbH
  • Owner: Denker&Wulf
  • Source: http://www.wenger-rosenau.de/
  • Source: http://www.wpd.de/referenzen/

       Production forecast

  • From Monday, September 25 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 9.4 %
  • Expected production: 20,300 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2010
  • 5 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm
  • Developers: PNE/PSEEG
  • Operator: PNE
  • Owner: EnBW Energie
  • Source: http://www.pnewind.com/unternehmen/referenzen/
  • Source: http://www.pseeg.de/referenzen.html

       Production forecast

  • From Monday, September 25 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 20.1 %
  • Expected production: 48,330 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Görike
  • Commissioning: 2002
  • 2 turbines: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WPD
  • Operator: WPD
  • Owner: WPD
  • Source: http://www.wpd.de/referenzen/

       Production forecast

  • From Monday, September 25 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 14.3 %
  • Expected production: 10,270 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Görike
  • Commissioning: 2013
  • 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: PNE
  • Source: http://www.pnewind.com/unternehmen/referenzen/

       Production forecast

  • From Monday, September 25 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 17.3 %
  • Expected production: 16,590 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52° 56' 23.9"
  • Longitude: 12° 11' 59.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52° 56' 23.9"
  • Longitude: 12° 11' 59.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52° 56' 23.9"
  • Longitude: 12° 11' 59.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 52° 56' 23.9"
  • Longitude: 12° 11' 59.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 52° 56' 23.9"
  • Longitude: 12° 11' 59.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 21 September 2017
Complete/correct this sheet: