Part #1:
- City: Celle
- 2 turbines: (manufacturer name not available)
- Total nominal power: 2,800 kW
- Operational
- Onshore wind farm
- Developer: Windstrom
- Operator: Windstrom
- Owner: Windstrom
- Source: http://www.windstrom.de/list-view.html
Production forecast
- From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.7 %
- Expected production: 9,270 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Bröckel
- Commissioning: 2003/09
- 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
- Operator: RWE
- Owner: RWE
Production forecast
- From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 28.8 %
- Expected production: 24,870 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 32' 54.4"
- Longitude: 10° 10' 49.3"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 31' 41.3"
- Longitude: 10° 11' 9.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 January 2019