Generalities
|
|
Details
Part #1:
- City: Zehdenick
- Commissioning:

- 4 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: Notus
- Operator: Notus
- Owner:

- Source:

Production forecast
- From Friday, June 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 21.4 %
- Expected production: 41,180 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Löwenberger Land
- Commissioning:

- 2 turbines: Vestas V112/3075 (power 3 075 kW, diameter 112 m)
- Hub height:

- Total nominal power: 6,150 kW
- Operational
- Onshore wind farm
Part #3:
- City: Löwenberger Land
- Commissioning:

- 2 turbines: Vestas V112/3075 (power 3 075 kW, diameter 112 m)
- Hub height:

- Total nominal power: 6,150 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 58' 45"
- Longitude: 13° 20' 16.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 57' 50.2"
- Longitude: 13° 15' 42.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 52° 57' 50.2"
- Longitude: 13° 15' 42.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 7 June 2022
Complete/correct this sheet: