Details
Part #1:
- Part: Caherciveen
- City: Caherciveen
- Commissioning:

- 3 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Developer: Mainstream Renewable Power
- Operator: Statkraft
- Owner:

- Source:

- Source:

- Source:

- Source:

Production forecast
- From Tuesday, December 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 31.6 %
- Expected production: 52,270 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Caherciveen
- City: Caherciveen
- Commissioning:

- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: Mainstream Renewable Power
- Operator: Statkraft
- Owner:

- Source:

- Source:

- Source:

- Source:

Production forecast
- From Tuesday, December 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 33.8 %
- Expected production: 18,660 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Caherciveen
- Latitude: 51° 56' 9"
- Longitude: -10° 5' 56.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Caherciveen
- Latitude: 51° 56' 9"
- Longitude: -10° 5' 56.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: