Details
- City: Landsmeer
- Commissioning:

- 1 turbine: NedWind
- Total nominal power: 250 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 46.6 %
- Expected production: 2,800 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 52° 25' 49.7"
- Longitude: 4° 56' 57.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 7 January 2022