Details
Part #1:
- City: Wartkowo
- Commissioning:

- 13 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:

- Total nominal power: 26,650 kW
- Operational
- Onshore wind farm
- Developer: EPA Sp zoo
- Operator: Engie
- Source:

Production forecast
- From Tuesday, May 24 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 39.3 %
- Expected production: 251,470 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Wartkowo
- Commissioning:

- 2 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:

- Total nominal power: 4,100 kW
- Operational
- Onshore wind farm
- Developer: EPA Sp zoo
- Operator: Engie
- Source:

Production forecast
- From Tuesday, May 24 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 36.3 %
- Expected production: 35,730 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 59' 19.9"
- Longitude: 15° 39' 51"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 59' 19.9"
- Longitude: 15° 39' 51"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 April 2019