[Back to previous page]
Generalities
|
|
Details
- City: Wulfen
- Commissioning:

- 27 turbines: Enron 1.5s (power 1 500 kW, diameter 70.5 m)
- Total nominal power: 40,500 kW
- Operational
- Onshore wind farm
- Developer: MBBF
- Operator: MBBF
- Source:

Production forecast
- From Friday, January 29 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 11.7 %
- Expected production: 113,680 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 51° 49' 8.2"
- Longitude: 11° 55' 42.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 March 2018