[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Werneck
 - Commissioning: 

 - 3 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Werneck
 - Commissioning: 

 - 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Bergtheim
 - Commissioning: 

 - 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Bergtheim
 - Commissioning: 

 - 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- Part: Dipbach
 - City: Bergtheim
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 49° 53' 49.8"
 - Longitude: 10° 8' 48.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 49° 53' 49.8"
 - Longitude: 10° 8' 48.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
Part #4: 
Part #5: 
Update for this sheet: 31 May 2022
Complete/correct this sheet: