Generalities
|
|
Details
Part #1:
- City: Gyhum
- Commissioning: 2002
- 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height: 50 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, December 17 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 16.1 %
- Expected production: 2,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Gyhum
- Commissioning: 2002
- 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height: 50 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developers: PNE/PSEEG
- Source: http://www.pnewind.com/unternehmen/referenzen/
- Source: http://www.pseeg.de/referenzen.html
Production forecast
- From Tuesday, December 17 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 26.8 %
- Expected production: 3,860 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 13' 30.4"
- Longitude: 9° 17' 33.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 13' 30.4"
- Longitude: 9° 17' 33.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 September 2019