[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning: 2014/07
- 32 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Total nominal power: 80,000 kW
- Operational
- Onshore wind farm
- Developers: EP Global Energy/Tractebel
- Owner: EP Wind
- Source: http://www.transelectrica.ro
- Source: http://www.enercap.com/content/view/234/
- Source: http://www.tractebel-engie.com/references/chirnogeni-wind-farm-2/
Production forecast
- From Friday, February 22 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 47.2 %
- Expected production: 905,640 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Chirnogeni
- Turbine(s): (manufacturer name not available)
- Total nominal power: 51,000 kW
- Operational
- Onshore wind farm
- Owner: DFEE Electrica SA
- Source: http://www.transelectrica.ro
Localisation
Part #1:
- Latitude: 43° 53' 25.2"
- Longitude: 28° 10' 5.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 43° 53' 20.8"
- Longitude: 28° 10' 10.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 December 2017
Complete/correct this sheet: