[Back to previous page]
Generalities
|
|
Details
- City: Lunestedt, Heerstedt
- Commissioning: 2015/12
- 14 turbines: GE Energy 2.75-103 (power 2 750 kW, diameter 103 m)
- Hub height: 98.3 m
- Total nominal power: 38,500 kW
- Operational
- Onshore wind farm
- Developer: Energiekontor
- Operator: Energiekontor
- Owners: Energiekontor/Encavis
- Source: http://www.energiekontor.de/Windparks_am_Netz.html
- Source: http://www.capitalstage.com/portfolio/solar-und-windparks.html
- Source: https://www.encavis.com/en/services/wind-parks/
Production forecast
- From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 53.1 %
- Expected production: 490,810 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 53° 27' 28.5"
- Longitude: 8° 43' 9.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 18 October 2019
Complete/correct this sheet: