[Back to previous page]
Generalities
|
|
Details
- City: Aldehuelas, Vizmanos, Arévalo de la Sierra, La Poveda, Sta, Cruz Yanguas
- Commissioning:

- 59 turbines: Made AE-52 (power 800 kW, diameter 52 m)
- Total nominal power: 47,200 kW
- Operational
- Onshore wind farm
- Operator: RWE
Production forecast
- From Friday, December 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 64.5 %
- Expected production: 730,400 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 41° 59' 50.2"
- Longitude: -2° 26' 23.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 August 2023
Complete/correct this sheet: