Wind farms
Valpardo (Spain)| Valpardo (Spain) |
|
| Operational (21,25 MW) |

| Country | Spain |
| County/Zone | Avila (Castilla y Leon) |
| City | Navalperal del Pinares |
| Wind farm type | Onshore wind farm |

![]() | 4.25 MW commissioned |
![]() | 17 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 20) |
| Operational | Gamesa G58/850 (x 5) |

| No source available |

| City | Navalperal del Pinares |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 4,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 35' 24" - Longitude -4° 25' 11.9" |
| Precise localization | No |
| City | Navalperal del Pinares |
| Commissioning | ![]() |
| Turbines | 20x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 17,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 35' 24" - Longitude -4° 25' 11.9" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Valdihuelo (1 km) Navas del Marqués (7 km) Navazuelo (7 km) Altos de Cartagena (8 km) Avila (9 km) Ojos Albos (15 km) Cruz de Hierro (15 km) Cruz de Hierro Ampliación (15 km) Aldeavieja (15 km) Villacastin (15 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Avila (Castilla y Leon) : 282.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||