			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Santa Maria del Cubillo
 - 22 turbines: Gamesa G47/660 (power 660 kW, diameter 47 m)
 - Total nominal power: 14,520 kW
 - Dismantled (2024)
 - Onshore wind farm
 
Part #2: 
- Part: Repowering
 - City: Santa Maria del Cubillo
 - Commissioning: 

 - 4 turbines: (manufacturer name not available)  
 - Total nominal power: 24,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Enel GreenPower
 - Operator: Enel GreenPower
 - Owner: 

 
Localisation
Part #1: 
Part #2: 