Wind farms
Tres Mesas I (Mexico)| Tres Mesas I (Mexico) |
|
| Operational (62,7 MW) |

| Country | Mexico |
| County/Zone | Tamaulipas |
| City | Llera de Canales |
| Wind farm type | Onshore wind farm |

![]() | 62.7 MW commissioned |

| Developers |
![]() ![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V117/3300 (x 19) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 23° 19' 4" - Longitude -99° 1' 27" |
| Precise localization | No |
Databases ![]() Mexico (9.6 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tres Mesas II (0 km) Tres Mesas III (0 km) Tres Mesas IV (15 km) Mesa La Paz (19 km) Vicente Guerrero (50 km) Ciudad Victoria (57 km) La Mesa (MX) (67 km) | ||
|
Insights Production capacity Mexico : 7,512.0 MW (end of 2025) Tamaulipas : 2,128.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 September 2024 |
||