Wind farms
Rio Gallego (Spain)| Rio Gallego (Spain) |
|
| Operational (38,7 MW) |

| Country | Spain |
| County/Zone | Huesca (Aragon) |
| City | Gurrea de GAllego |
| Wind farm type | Onshore wind farm |

![]() | 36 MW commissioned |
![]() | 2.7 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Neg Micon NM52/900 (x 43) |

| No source available |

| City | Gurrea de GAllego |
| Commissioning | ![]() |
| Turbines | 40x Neg Micon NM52/900 (power 900 kW, diameter 52.2 m) |
| Total nominal power | 36,000 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 42° 0' 41.2" - Longitude -0° 40' 44" |
| Precise localization | Yes |
| City | Gurrea de GAllego |
| Turbines | 3x Neg Micon NM52/900 (power 900 kW, diameter 52.2 m) |
| Total nominal power | 2,700 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 42° 0' 41.2" - Longitude -0° 40' 44" |
| Precise localization | No |
Databases ![]() Spain (59.9 GW) Europe (666.7 GW) World (2,490.2 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Valiente (2 km) Las Gorgas (5 km) Odon de Buen II (7 km) Santa Quiteria (8 km) La Sotonera (9 km) Odon de Buen III (10 km) Tardienta II (11 km) Tardienta I (11 km) El Balsón (15 km) Rabosera (15 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Huesca (Aragon) : 371.8 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 28 August 2026 |
||