Generalities
|
|
Details
- City: Almudévar, Tardienta
- Commissioning:

- 40 turbines: Neg Micon NM52/900 (power 900 kW, diameter 52.2 m)
- Total nominal power: 36,000 kW
- Operational
- Onshore wind farm
- Developer: Vattenfall
- Operator: Vattenfall