Generalities
|
|
Details
- City: Almudévar
- Commissioning:

- 49 turbines: Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 41,650 kW
- Operational
- Onshore wind farm
- Operator: Enel GreenPower
- Source: