Wind farms
Ciesma de Grisel (Spain)| Ciesma de Grisel (Spain) |
|
| Operational (13,5 MW) |

| Country | Spain |
| County/Zone | Zaragoza (Aragon) |
| City | Grisel |
| Wind farm type | Onshore wind farm |

![]() | 10.5 MW commissioned |
![]() | 3 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Neg Micon NM48/750 (x 18) |

![]() | |

| City | Grisel |
| Commissioning | ![]() |
| Turbines | 14x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Total nominal power | 10,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 51' 38.1" - Longitude -1° 43' 26" |
| Precise localization | Yes |
| Part | Ampliación |
| City | Grisel |
| Commissioning | ![]() |
| Turbines | 4x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 51' 38.1" - Longitude -1° 43' 26" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Grisel II (0 km) Tarazona Sur (5 km) Borja II (Arbolitas) (13 km) Agreda (16 km) Molino de Carragüeyes (16 km) Boyal I (16 km) Molino de Arbolitas (16 km) Campo de Borja (16 km) Boyal II (16 km) Boquerón II (16 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Zaragoza (Aragon) : 4,329.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||