Wind farms
Falkenthal (Germany)| Falkenthal (Germany) |
|
| Operational (26,6 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Löwenberger Land |
| Wind farm type | Onshore wind farm |

![]() | 16 MW commissioned |
![]() | 6 MW commissioned |
![]() | 4.6 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | Enercon E70/2000 (x 8) |
| Operational | Enercon E82/2000 (x 3) |
| Operational | Enercon E82/2300 (x 2) |

![]() | |

| City | Löwenberger Land |
| Commissioning | ![]() |
| Turbines | 8x Enercon E70/2000 (power 2,000 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 16,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 55' 12.9" - Longitude 13° 17' 30.8" |
| Precise localization | Yes |
| City | Löwenberger Land |
| Commissioning | ![]() |
| Turbines | 3x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 55' 12.9" - Longitude 13° 17' 30.8" |
| Precise localization | Yes |
| Part | Falkenthal 4 WEA 13 |
| City | Löwenberger Land |
| Commissioning | ![]() |
| Turbines | 2x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,600 kW |
| Status | Operational |
| Coordinates | Latitude 52° 55' 29.9" - Longitude 13° 17' 13.2" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Timpberg (5 km) Klein Mutz (5 km) Timpberg 7 (5 km) Hellberge (6 km) Hellberge III (6 km) Hangelberg (6 km) Badingen (8 km) Mildenberg (8 km) Zehdenick (8 km) Zabelsdorf (13 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Brandenburg : 10,012.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 7 June 2022 |
||