Wind farms
Tortosa (Spain)| Tortosa (Spain) |
|
| Operational (30,36 MW) |

| Country | Spain |
| County/Zone | Tarragona (Cataluna) |
| City | Tortosa |
| Other name | Coll d´Alba |
| Wind farm type | Onshore wind farm |

![]() | 30.36 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Made AE-61 (x 23) |

![]() | |

| Coordinates | Latitude 40° 48' 36" - Longitude 0° 31' 12" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Ecovent CAT II y III (0 km) Pebesa (Baix Ebre) (0 km) Les Calobres (14 km) Les Colladetes (18 km) Punta Redona (26 km) Torre Madrina (32 km) Mudéfer (32 km) Mudéfer II (32 km) El Motarro (35 km) Corbera (35 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Tarragona (Cataluna) : 874.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||