[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Lelystad
- Commissioning:

- 3 turbines: Neg Micon
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Vattenfall
- Operator: Vattenfall
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 16.9 %
- Expected production: 12,200 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Lelystad
- Commissioning:

- 6 turbines: Enercon
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Vattenfall
- Operator: Vattenfall
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.6 %
- Expected production: 21,800 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Lelystad
- Commissioning:

- 3 turbines: Neg Micon
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Vattenfall
- Operator: Vattenfall
- Owner:

- Source:

Localisation
Part #1:
- Latitude: 52° 24' 43.1"
- Longitude: 5° 34' 1.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 24' 43.1"
- Longitude: 5° 34' 1.2"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 52° 24' 43.1"
- Longitude: 5° 34' 1.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: