Wind farms
Manantiales (AR) (Argentina)| Manantiales (AR) (Argentina) |
|
| Operational (99 MW) |

| Country | Argentina |
| County/Zone | Chubut |
| City | Manantiales Behr |
| Wind farm type | Onshore wind farm |

![]() | 49.5 MW commissioned |
![]() | 49.5 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V112/3300 (x 30) |

![]() | |

| City | Manantiales Behr |
| Commissioning | ![]() |
| Turbines | 15x Vestas V112/3300 (power 3,300 kW, diameter 112 m) |
| Hub height | ![]() |
| Total nominal power | 49,500 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude -45° 40' 29.4" - Longitude -67° 47' 20.6" |
| Precise localization | Yes |
| City | Manantiales Behr |
| Commissioning | ![]() |
| Turbines | 15x Vestas V112/3300 (power 3,300 kW, diameter 112 m) |
| Hub height | ![]() |
| Total nominal power | 49,500 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude -45° 40' 29.4" - Longitude -67° 47' 20.6" |
| Precise localization | Yes |
Databases ![]() Argentina (5.2 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Diadema (13 km) Tordillo (22 km) Antonio Moran (24 km) Kosten (26 km) Rada Tilly (33 km) Malaspina I (96 km) Cañadon Leon (103 km) Los Hércules (116 km) | ||
|
Insights Production capacity Argentina : 4,497.0 MW (end of 2025) Chubut : 1,288.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 7 July 2024 |
||