Wind farms
Bornes (Portugal)| Bornes (Portugal) |
|
| Operational (70 MW) |

| Country | Portugal |
| County/Zone | Bragança (Norte) |
| City | Macedo de Cavaleiros |
| Wind farm type | Onshore wind farm |

![]() | 60 MW commissioned |
![]() | 10 MW commissioned |

| Developers |
![]() #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturers |
|

| Operational | Nordex N90/2500 (x 24) |
| Operational | Senvion MM100 (x 5) |

![]() | |
![]() | |
![]() | |
![]() | |

| City | Macedo de Cavaleiros |
| Commissioning | ![]() |
| Turbines | 24x Nordex N90/2500 (power 2,500 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 60,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 27' 49.8" - Longitude -6° 57' 45.2" |
| Precise localization | Yes |
| City | Macedo de Cavaleiros |
| Turbines | 5x Senvion MM100 (power 2,000 kW, diameter 100 m) |
| Total nominal power | 10,000 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 27' 49.8" - Longitude -6° 57' 45.2" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (658.2 GW) World (2,455.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Borninhos (6 km) Felgar (33 km) Castanheira (38 km) Padrela (45 km) Casa da Lagoa (48 km) Alto da Coutada (50 km) Mairos I (52 km) Mairos II (52 km) Salgueiros-Guilhado (53 km) Cha do Guilhado (55 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Bragança (Norte) : 84.0 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 20 June 2026 |
||