Generalities
- Wind farm name: Monte Falcone
- Country: Italy
- County / Zone: Campania
|
|
Details
Part #1:
Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 23 %
- Expected production: 33,130 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Montefalcone di Val Fortore
- Commissioning:

- 43 turbines: Vestas V42/600 (power 600 kW, diameter 42 m)
- Total nominal power: 25,800 kW
- Operational
- Onshore wind farm
- Operator: IVPC
- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 8.8 %
- Expected production: 54,660 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Montefalcone di Val Fortore
- Commissioning:

- 1 turbine: EWT Directwind 900/61 (power 900 kW, diameter 61 m)
- Total nominal power: 900 kW
- Operational
- Onshore wind farm
Part #4:
- Part: Montefalcone di Val Fortore
- Commissioning:

- 6 turbines: Gamesa G114/2500 (power 2 500 kW, diameter 114 m)
- Total nominal power: 15,000 kW
- Operational
- Onshore wind farm
- Operator: E2i Energie Speciali
- Source:

Localisation
Part #1:
- Latitude: 41° 18' 48.3"
- Longitude: 14° 58' 34.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Montefalcone di Val Fortore
- Latitude: 41° 19' 47.9"
- Longitude: 15° 0' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Montefalcone di Val Fortore
- Latitude: 41° 19' 47.9"
- Longitude: 15° 0' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Montefalcone di Val Fortore
- Latitude: 41° 19' 47.9"
- Longitude: 15° 0' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 18 September 2023