Wind farms
Parc des Micmacs (Canada)| Parc des Micmacs (Canada) |
|
| Operational (149,25 MW) |

| Country | Canada |
| County/Zone | Québec |
| City | Avignon - Listuguj |
| Other name | Mesgi’g Ugju’s’n |
| Wind farm type | Onshore wind farm |

![]() | 147.2 MW commissioned |
![]() | 2.05 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturer |
|
| Site officiel | http://www.muwindfarm.com/fr/ |

| Operational | Senvion 3.2M114 (x 46) |
| Operational | Senvion MM92/2050 (x 1) |

![]() | |
![]() | |
![]() | |
![]() | |

| Part | Mesgi’g Ugju’s’n |
| City | Avignon, Listuguj |
| Commissioning | ![]() |
| Turbines | 46x Senvion 3.2M114 (power 3,200 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 147,200 kW |
| Status | Operational |
| Developer | ![]() |
| Owners | /#ND |
| Coordinates | Latitude 48° 16' 47.8" - Longitude -66° 44' 43.7" |
| Precise localization | Yes |
| Part | Mesgi’g Ugju’s’n |
| City | Avignon, Listuguj |
| Commissioning | ![]() |
| Turbine | 1x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Hub height | ![]() |
| Total nominal power | 2,050 kW |
| Status | Operational |
| Developer | ![]() |
| Owners | /#ND |
| Coordinates | Latitude 48° 16' 47.8" - Longitude -66° 44' 43.7" |
| Precise localization | Yes |
Databases ![]() Canada (40.6 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Vents du Kempt (28 km) Carleton (48 km) Roncevaux (52 km) Le Plateau I (58 km) Le Plateau II (58 km) Le Nordais (83 km) Jardin d’Eole (83 km) Caribou (92 km) | ||
|
Insights Production capacity Canada : 17,745.0 MW (end of 2025) Québec : 5,308.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 February 2026 |
||