Guldager (Hjorring) (Denmark)| Guldager (Hjorring) (Denmark) |
|
| Operational (6,9 MW) - Dismantled (0,18 MW) |

| Country | Denmark |
| County/Zone | Hjorring (Nordjylland) |
| City | Guldager |
| Wind farm type | Onshore wind farm |

![]() | 0.18 MW commissioned |
![]() | 6.9 MW commissioned |
![]() | 0.18 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V117/3450 (x 2) |
| Dismantled | Danwin 23/180 (x 1) |

![]() | |

| City | Guldager |
| Commissioning | ![]() |
| Turbine | 1x Danwin 23/180 (power 180 kW, diameter 23.2 m) |
| Hub height | ![]() |
| Total nominal power | 180 kW |
| Status | Dismantled (2017/05) |
| Coordinates | Latitude 57° 22' 50.3" - Longitude 10° 0' 41.9" |
| Precise localization | No |
| City | Guldager |
| Commissioning | ![]() |
| Turbines | 2x Vestas V117/3450 (power 3,450 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 6,900 kW |
| Status | Operational |
| Coordinates | Latitude 57° 22' 50.3" - Longitude 10° 0' 41.9" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Høgsted By (2 km) Gunderup (Hjorring) (2 km) Arup (DK) (5 km) Vra (Frederikshavn) (5 km) Tars (Hjorring) (6 km) Smidstrup (Hjorring) (6 km) Karmisholt (7 km) Vejby (Hjorring) (8 km) Vollerup (Hjorring) (8 km) Hjørring (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Hjorring (Nordjylland) : 138.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 April 2019 |
||