Wind farms
Banzi (Italy)| Banzi (Italy) |
|
| Operational (62 MW) |

| Country | Italy |
| County/Zone | Basilicata |
| City | Banzi |
| Wind farm type | Onshore wind farm |

![]() | 30 MW commissioned |
![]() | 10 MW commissioned |
![]() | 22 MW commissioned |

| Developers |
![]() ![]() #ND |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturers |
#ND |

| Operational | Gamesa G97/2000 (x 15) |
| Operational | #ND (x 11) |
| Operational | Vestas V100/2000 (x 5) |

![]() | |
![]() | |

| City | Banzi |
| Commissioning | ![]() |
| Turbines | 15x Gamesa G97/2000 (power 2,000 kW, diameter 97 m) |
| Total nominal power | 30,000 kW |
| Status | Operational |
| Coordinates | Latitude 40° 53' 58.8" - Longitude 16° 0' 54.3" |
| Precise localization | Yes |
| Part | Crossenergy Srl |
| City | Banzi |
| Commissioning | ![]() |
| Turbines | 5x Vestas V100/2000 (power 2,000 kW, diameter 100 m) |
| Total nominal power | 10,000 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 53' 58.8" - Longitude 16° 0' 54.3" |
| Precise localization | Yes |
Databases ![]() Italy (102.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Banzi - Tre Titoli (0 km) Cerreto (6 km) Palazzo San Gervasio (9 km) Serra Martino (14 km) Forenza (14 km) Montemilone (15 km) Oppido (15 km) Minervino Murge (18 km) Minervino (18 km) Maschito (19 km) | ||
|
Insights Production capacity Italy : 13,481.0 MW (end of 2025) Basilicata : 1,299.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 January 2026 |
||