[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Guarda
- Commissioning:

- 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 55.5 %
- Expected production: 53,250 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Guarda
- Commissioning:

- 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 55.5 %
- Expected production: 53,250 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 40° 33' 24"
- Longitude: -7° 16' 56.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 40° 33' 24"
- Longitude: -7° 16' 56.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 29 December 2020
Complete/correct this sheet: